Passage of Resolution ordering the work to proceed and adopting special assessments in the amount of $2,008,604.86 for the Grand Ave S (Lake St W to 48th St W) Street Reconstruction Project, Special Improvement of Existing Street No. 6768 (PV141).
-
Passage of Resolution requesting the Board of Estimate and Taxation authorize the City's issuance and sale of assessment bonds in the amount of $2,008,604.86 for the project.
-
Passage of Resolution ordering the abandonment and removal of areaways located in the public right-of-way in conflict with the project.
Consent
-
Contract with Neighborhood Recycling Corporation (dba Eureka Recycling) for processing and marketing of commingled recyclables (2021-00079)
Authorizing a contract with Neighborhood Recycling Corporation (dba Eureka Recycling), in the estimated amount of $4,005,200, for the processing and marketing of 100% of the City’s recyclable materials for a five-year period, from Dec 1, 2021, through Nov 30, 2026, with no options to extend the contract.
-
Contract amendment with In Control, Inc. for the Fridley Filtration Plant Rehabilitation Project and general services programming (2021-00080)
Authorizing an amendment to Contract No. C-43394 with In Control, Inc., for an extension through Dec 31, 2022, for the Fridley Filtration Plant Rehabilitation Project and general services programming to coordinate with construction delays.
-
Contract amendment with Cy-Con, Inc. for the Ramp A Waterproofing and Structural Repairs Project (2021-00081)
Authorizing an increase to Contract No. COM0001455 with Cy-Con, Inc., in the amount of $38,615 for a total amount not to exceed $296,115, and an extension through March 31, 2021, for additional work required due to unforeseen conditions to complete the Ramp A Waterproofing and Structural Repairs Project, all in accordance with City specifications.
-
Contract amendment with Minnesota Department of Transportation for temporary storage of impound vehicles under I-94 bridges (2021-00082)Authorizing an amendment to Contract No. C-21506 with the Minnesota Department of Transportation to allow for temporary storage of impound vehicles at surface parking lots under I-94 bridges with no increase in the current contract value.
-
Contract amendment with Max Steininger, Inc. for the 34th Ave S Street Reconstruction Project (2021-00083)
Authorizing an increase to Contract No. COM0000026 with Max Steininger, Inc., in the amount of $558,000 for a total amount not to exceed $6,279,372.54, for additional project work and costs associated with unforeseen conditions for the 34th Ave S Street Reconstruction Project, all in accordance with City specifications.
-
Contract amendment with Meyer Contracting, Inc. for Bridge 9 Pier 6 and 7 Repair Project (2021-00084)
Authorizing an increase to Contract No. COM0002453 with Meyer Contracting, Inc., in the amount of $22,440 for a total amount not to exceed $1,659,191.85, for additional project work and costs associated with unforeseen conditions for the Bridge 9 Pier 6 and 7 Repair Project, all in accordance with City specifications.
-
Alley easement deed from TF Hennepin LLC for a portion of 2841 Hennepin Ave (2021-00085)
Authorizing the acceptance of an alley easement deed from TF Hennepin LLC over a portion of the property located at 2841 Hennepin Ave.
-
Alley easement deed from DREH LLC for a portion of 2940 17th Ave S (2021-00086)
Authorizing the acceptance of an alley easement deed from DREH LLC over a portion of the property located at 2940 17th Ave S.
-
Bicycle Advisory Committee (BAC) appointments (2021-00087)
Approving the following Council appointments for two-year terms, beginning June 1, 2020, and ending May 31, 2022: Martha Grimes, Seat 4, Ward 4; and Brianne Whitcraft, Seat 12, Ward 12.
-
Penn Ave N (Plymouth Ave N to 14th Ave N) Street Reconstruction Project: Layout approval (2021-00088)
Approving the layout for the Penn Ave N Street Reconstruction Project between Plymouth Ave N and 14th Ave N.
-
Downtown East Street Reconstruction: Project designation, cost estimate, and setting public hearing (2021-00089)
-
Passage of Resolution designating the location and improvements proposed to be made in the Downtown East Street Reconstruction Project, Special Improvement of Existing Street No. 6770 (PV142).
-
Adopting report receiving the cost estimate in the amount of $4,125,000, directing the preparation of proposed special assessments against the list of benefitted properties, and setting a public hearing for March 31, 2021, to consider the project, assessments, and the abandonment and removal of areaways in conflict with the project.
-
-
Bid for Upgrades of Americans with Disabilities Act (ADA) Pedestrian Ramps Project (2021-00091)
Accepting the low bid of Concrete Idea, Inc., submitted on Event No. 1317, in an estimated annual amount of $500,000, to provide all materials, labor, equipment, and incidentals necessary for the Upgrades of Americans with Disabilities Act (ADA) Pedestrian Ramps Project, and authorizing a contract for the project, all in accordance with City specifications.