Request for Committee Action

A briefing memo explaining the purpose, background, and impact of the requested action.

Agreement with Xcel Energy for Hennepin Ave S Street Reconstruction Project (Lake St W to Douglas Ave) (RCA-2023-00496)


ORIGINATING DEPARTMENT

Public Works

To Committee(s)

# Committee Name Meeting Date
1 Public Works & Infrastructure Committee May 18, 2023
Lead Staff:
Adam Hayow P.E., Senior Professional Engineer, Transportation Engineering & Design
Presented By:
Adam Hayow P.E., Senior Professional Engineer, Transportation Engineering & Design

Action Item(s)

# File Type Subcategory Item Description
1 Action Contract/Agreement

Authorizing an agreement with Xcel Energy, in the amount of $39,000, for conduit installation within the Hennepin Ave Bridge over the Midtown Greenway (Bridge No 27599) as part of the Hennepin Ave S Street Reconstruction Project (Lake St W to Douglas Ave).

Ward / Neighborhood / Address

# Ward Neighborhood Address
1. Ward 7 East Isles
2. Ward 7 Lowry Hill
3. Ward 10 Lowry Hill East

Background Analysis

Public Works will reconstruct 1.4 miles of Hennepin Avenue South between Douglas Avenue and West Lake Street. The scope of work will include full reconstruction of Hennepin Avenue South due to the age and deteriorated condition of the street, will improve pedestrian safety, fill a bicycle network gap, include space for transit priority lanes, and incorporate green stormwater infrastructure improvements.

Xcel Energy Agreement
As part of the Hennepin Ave reconstruction project, the City will install new Xcel Energy conduits within the Hennepin Ave Bridge over the Midtown Greenway (Bridge No 27599). Xcel Energy will reimburse the City for all costs associated with the planning, design, materials, and installation of Xcel Energy facilities. The current estimated amount is $39,000. Construction is anticipated to start in 2024.